Surplus lotPrime PBT/PET, 55% glass, from a canceled auto program.120,000 lb PBT/PET 55% glass. See the lot
Plastic resin supply for the U.S. and Canada · Mon–Fri, 8am–5pm ET

Your resin grade was discontinued. Now what?

A discontinuation notice, an allocation or a force majeure can leave you without the resin your part, process and customer approvals were built around. The steps are usually the same: buy time, define what really has to match, then qualify a replacement before the old material runs out. Start by finding out which of those three situations you are in, because only one of them is permanent.

Quick diagnosis

What happenedWhat it usually meansWhat to do first
A written discontinuation notice with a last-order dateThe grade is going away for good.Ask for the last-time-buy quantity and date, and whether the producer names a successor grade.
You are told the grade is “on allocation”The grade is still made, but supply is rationed, usually as a share of what you bought before.Ask what quantity you are allocated and for how long. Cover the gap and keep the grade.
A force majeure letterThe producer says an event outside its control stops it from meeting its commitments. The grade is not discontinued.Ask which grades are affected and for how long. Check whether another seller has the same grade in stock.
The grade is “replaced by” a new grade numberIt may be a new name on the same material, or it may be a reformulation.Ask in writing whether the formulation, the additive package or the plant changed, and whether the UL and food-contact documents carry over.
Your supplier cannot quote it, or quotes a very long lead timeIt may be that seller’s stock problem and not the producer’s.Ask a second seller for the same grade before you assume it is gone.
The grade is named on a drawing, a UL file or a customer approvalAny replacement has to be approved through that same route before you ship.Find the approval documents now and ask the customer what a change requires.
A custom color or compound is droppedThe compounder may have lost a pigment, an additive or the base resin. The rest of the recipe may still exist.Ask exactly which ingredient changed.

Checks in order, cheapest first

  1. Get the notice in writing and read the dates. You need the last-order date, the last-ship date and the exact grade names covered.
  2. Ask your current supplier what is left. Ask how much inventory remains and whether there is a last-time buy.
  3. Work out how much bridge inventory you need. Multiply your monthly use by the months that qualification will take, which is often several. Store the material sealed and dry.
  4. Pull the paperwork you already have. You need the technical data sheet for the old grade, your process settings, and your incoming COAs, which show the actual values your process is tuned to.
  5. List the approvals tied to the grade. Look for customer drawings, PPAP, UL recognition of the resin (the yellow card), the UL file for your part or end product, food-contact statements and medical device records.
  6. Mark what must match. List the properties that make the part work and mark the critical ones. That list is your specification for the replacement.
  7. Build a candidate list. Look in the same polymer family, with the same filler and level, and compare melt flow and density at the same test conditions. Hot melt formulators matching an EVA base can start from hot melt EVA.
  8. Sample, then trial, then document. Run a sample on your actual process and test the parts. Then run a small production trial. Get the approval through the proper route before you ship.

The reference facts

The terms you will see in a supply notice, and what each one means for you.

TermWhat it means
DiscontinuationThe producer stops making the grade. Permanent.
Last-time buyA final chance to order the grade before production ends, usually with a deadline and a quantity limit.
AllocationThe grade is still made, but each customer is limited to a set quantity. Temporary.
Force majeureThe producer declares that an event outside its control prevents it from meeting its commitments. Usually temporary.
Successor gradeThe grade the producer offers in place of the old one. It may or may not be the same formulation.
Same grade, second sellerNormally not a material change.
Equivalent grade, another producerA material change, even when the properties match. It may need customer notification or requalification.

Typical quantities for qualifying a replacement:

UnitTypical net weightUsed for
SampleAbout 50 lb, available upon credit approvalA first run on your process
Gaylord box~1,000–1,600 lbA production trial. This is the minimum order.
LTL (less than truckload)1 to about 6 gaylords (under roughly 10,000 lb)Bridge inventory and steady use below a full truck
Full truckload (53 ft van)~40,000–45,000 lbHigh-volume grades

Weights are typical ranges and vary by resin, packaging and carrier limits. Always check the net weight on the quote. The full list is in resin packaging and order sizes.

What has to match

The properties that usually make the part work are melt flow, density, impact, heat resistance, filler type and level, flame rating, color and regulatory status. Read data sheets carefully: ISO and ASTM values, and values from different specimen thicknesses, are not directly comparable. See how to compare melt flow. If the old grade is known only by a brand name, look up the trade name to confirm the base resin first. For EVA, where a name like 28-400 gives the VA and melt index, see 28% VA EVA grades. The matching itself, property by property, is covered in how to find an equivalent resin grade.

Documenting the approval

If the old grade is named in a customer approval, a UL file or a medical device record, the replacement must be approved through the same route before you ship: customer notification and PPAP if required, a UL file update, or documented change control. Keep the paperwork. For flame-rated parts, see UL 94 flame ratings. For food-contact parts, see FDA food-contact compliance.

Qualifying a backup at the same time

Approving two candidates gives you an approved alternative already on file for the next disruption. See how a backup source works.

Replacement routes, and what each one costs you

RouteWhy it helpsWhat it costs you
A last-time buy or bridge inventoryBuys time to qualify a replacement properly.Cash tied up and storage space. Moisture-sensitive resins must stay sealed and dry. It delays the problem and does not solve it.
The same grade from another sellerNormally not a material change, so no requalification.The stock is finite. Check the lot age and that the packaging is sealed.
The producer’s successor gradeOften the closest match in formulation.It is still a new grade name. UL, food-contact and customer paperwork has to be reissued, and you need to confirm what changed.
An equivalent grade from another producerRestores long-term supply.Customer approval and a trial run, and possibly a PPAP or a UL file update. Shrinkage and color can differ.
A different resin familyAn option when no close alternative exists.A full requalification, likely tooling changes, and different drying and processing.
Two approved candidates in place of oneAn approved alternative is already on file.A second set of trials and approvals.

Any resin change moves your dimensions. The tool was cut for the shrinkage of the resin you run now. An equivalent that shrinks a little differently makes a different part from the same steel, so check critical dimensions before you approve a swap.

Often confused with

  • Allocation. The grade still exists and you still get some of it. You need to cover a gap, and you may not need a replacement at all.
  • Force majeure. A temporary stop at the producer. Ask for the expected duration before you start a requalification you may not need.
  • A renamed grade. Sometimes only the name changes. Ask for a written statement that the formulation is unchanged, and check that the UL and food-contact documents show the new name.
  • One seller out of stock. A seller with no stock is a different problem from a producer that has stopped making the grade. See price increases and long lead times.

Quick answers

My resin grade was discontinued. What do I do?

Buy time, define what really has to match, then qualify a replacement before the old material runs out. First get the notice in writing and read the dates, because a discontinuation is permanent while an allocation or force majeure is usually temporary. Ask about a last-time buy and a successor grade.

How do I find an equivalent resin grade?

Start from what must match. List the properties that make the part work and mark the critical ones. Then look in the same polymer family, with the same filler and level, and compare melt flow and density at the same test conditions. Sample, trial and document before shipping.

What can replace an obsolete plastic grade?

The routes are the same grade from another seller, the producer’s successor grade, an equivalent grade from another producer, or a different resin family when no close alternative exists. The same grade from a second seller is normally not a material change. An equivalent from another producer is one.

Do I need customer approval to switch to an equivalent resin?

Often, yes. An equivalent grade from another producer is a material change, even when the properties match. If the old grade is named on a drawing, a UL file or a customer approval, the replacement has to be approved through that same route before parts ship.

What is the difference between discontinuation, allocation and force majeure?

Discontinuation means the producer stops making the grade, and it is permanent. Allocation means the grade is still made but each customer is limited to a set quantity. Force majeure means an event outside the producer’s control prevents it from meeting its commitments, and it is usually temporary.

Grade discontinued? Send the old grade name, and a polymer chemist will quote a matched alternative, subject to your approval. Get a quote →

Related pages (10)
Text usRequest a Quote