A price-increase letter or a lead time that just doubled is a good moment to check where you stand before you accept it. Start with the questions that cost nothing: what exactly changed, on which grade, and from what date. Then get a second quote on the same grade, compare delivered cost, and decide whether you need a second source.
Quick diagnosis
| What happened | What it usually means | What to do first |
|---|---|---|
| A letter announces an increase on a whole resin family from a set date | A market-wide move, driven by feedstock costs, plant outages or demand. Announced increases are not always passed through in full. | Ask your supplier what applies to your grade, and whether it applies to orders already placed. |
| Only your grade, or only your supplier, went up | The cause is specific to that grade or that seller. | Get a second quote on the same grade at the same volume. |
| The lead time stretched and the price did not move | Supply of that grade is tight, or the seller’s stock is low. | Ask whether the delay is at the producer or at the warehouse, and what can ship from stock. |
| You are told the grade is on allocation | Supply is rationed, usually as a share of what you bought before. | Ask what quantity you are allocated. Start qualifying a second source now. |
| A force majeure letter | The producer says an event outside its control stops it from delivering. | Ask which grades are affected and for how long. Check other sellers for the same grade. |
| The resin price held, but freight, surcharges or the minimum order went up | Your delivered cost changed even though the resin price did not. | Compare delivered cost per pound, line by line. |
| A much lower quote arrives from another seller | The two quotes may not be for the same thing: quality tier, packaging and freight terms all vary. | Ask in writing whether the material is prime and comes with a lot COA. |
Checks in order, cheapest first
- Read the letter for the grade, the amount and the effective date. A family-wide announcement may not apply to your grade in full. How to read a price increase letter goes through it line by line.
- Ask your current supplier the free questions. Does it apply to open orders? How long is the new price held? What can ship from stock today?
- Check your own numbers. Know your monthly use, your inventory on hand and how many weeks that covers. Those three figures tell you how much time you have.
- Get a second quote on the same grade and the same volume. This is the simplest way to see where the market is. If the same grade is not available, ask for a close alternative for you to qualify.
- Compare delivered cost. Two quotes with the same resin price can land at different costs. Line up the items listed under “What goes into delivered cost” below.
- Confirm that both quotes are like for like. Both should be for prime material with a COA. See prime vs. off-grade.
- Look at your order size. A larger order usually lowers freight per pound. It also ties up cash and floor space, so weigh both.
- Qualify a second source while you have time. Sample and trial it, and get the approval on file before the next disruption. Samples of about 50 lb are available upon credit approval.
The reference facts
Typical packaging and shipment sizes. Order size is the biggest single lever on freight per pound.
| Unit | Typical net weight | Usually best for |
|---|---|---|
| 25 kg / 55 lb bags | 55 lb each, often 40–55 bags per pallet | Specialty and high-cost resins, small runs |
| Gaylord box | ~1,000–1,600 lb | First orders, engineering grades, most molders |
| Bulk bag | ~1,000–2,200 lb | Plants with bag unloaders |
| LTL (less than truckload) | 1 to about 6 gaylords (under roughly 10,000 lb) | Steady monthly use below a full truck |
| Partial (volume) truckload | About 7 to 18 gaylords | Larger monthly use that still does not fill a truck |
| Full truckload (53 ft van) | ~40,000–45,000 lb | High-volume grades, best freight per pound |
| Bulk truck (pneumatic) | ~40,000–50,000 lb | Plants with silos |
| Railcar (covered hopper) | ~180,000–210,000 lb | Very high-volume silo users |
Weights are typical ranges and vary by resin, packaging and carrier limits. Always check the net weight on the quote. The detail is in resin packaging and order sizes.
Why prices and lead times move
Resin prices move with feedstock costs, plant outages and demand. Lead times stretch when producers run short or when a seller’s warehouse stock runs down. Neither is under your control. What you can control is how many sources you have approved and how much inventory you hold. For the current direction by resin family, see the latest resin market note.
What goes into delivered cost
Line up these items on both quotes:
- Freight to your dock
- Packaging, pallet and handling charges
- Minimum order size
- Payment terms
- How long the quote is good for
A single gaylord shipped LTL carries far more freight per pound than the same resin in a full truck. See how order size changes your price.
See what producers are asking now: the resin price increase tracker lists each announced increase by resin, with the amount, effective date, what later reports said settled, and the source.
Supply changes, and what each one costs you
| Change | Why it helps | What it costs you |
|---|---|---|
| The same grade from a second seller | Normally not a material change, though some customers (automotive PPAP, medical) require notice or a first-lot check when the supplier changes. | Two suppliers to manage. Splitting your volume can mean smaller shipments and more freight per pound. |
| A close alternative from another producer | Your supply no longer depends on one producer’s plant. | It is a material change. It needs customer approval and a qualification run, and shrinkage and color can differ. |
| A larger order size | Lower freight per pound, and often a lower resin price. | Cash tied up in inventory, warehouse space, and moisture-sensitive resins sitting longer. |
| More safety stock | Covers you when a lead time slips. | The same cash and space, and the material has to stay sealed and dry. |
| A lower quality tier (generic prime, wide-spec) | A lower price. | More variation from lot to lot. Not suitable where the part has a specification, a customer approval or a regulatory requirement. |
Any resin change moves your dimensions. The tool was cut for the shrinkage of the resin you run now. If you move to an equivalent grade, check critical dimensions before you approve it.
If the grade is PA66, the usual alternatives and the parts each one suits are in PA66 shortage alternatives.
Often confused with
- Allocation. A long lead time means the material is late. Allocation means you will get only part of what you ordered. Ask which one applies.
- Force majeure. A price increase leaves supply in place. A force majeure interrupts it, so the first question is how long, and the second is who else has stock.
- Discontinuation. If the grade is being withdrawn, a second quote will not fix it. See what to do when a grade is discontinued.
- A freight increase. If the resin price is unchanged and the delivered price rose, look at freight, surcharges and order size before you look for a new resin source.
Quick answers
Why did my resin price go up?
Resin prices move with feedstock costs, plant outages and demand. A letter covering a whole resin family is usually a market-wide move, and announced increases are not all passed through in full. If only your grade or your supplier went up, the cause is specific to that grade or seller, so get a second quote.
What do I do when resin lead times get longer?
Start by asking whether the delay is at the producer or at the warehouse, and what can ship from stock. Then check your monthly use, your inventory on hand and how many weeks that covers. Ask whether the grade is on allocation, and begin qualifying a second source while you have time.
How do I find a second resin supplier?
Start by getting a second quote on the same grade at the same volume. The same grade from a second seller is normally not a material change, though some customers (automotive PPAP, medical) require notice or a first-lot check when the supplier changes. A close alternative from another producer is a material change that needs customer approval and a qualification run.
How do I compare two resin quotes?
Compare delivered cost, since two quotes with the same resin price can land at different costs. Line up freight to your dock, packaging and handling charges, minimum order size, payment terms and how long the quote is good for. Confirm in writing that both are for prime material with a lot COA.
What is the difference between a long lead time and allocation?
A long lead time means the material is late. Allocation means supply is rationed and you will get only part of what you ordered, usually as a share of what you bought before. Ask which one applies and what quantity you are allocated, then start qualifying a second source.
Send the grade for a quote
A polymer chemist reviews every request. We aim to quote within one to three business days.
Send the grade you run now and your volume
A polymer chemist reviews every request, then matches your grade or finds a matched alternative and prices it.
What to send for an accurate quote
- The grade name, from any supplier, or a data sheet
- Color (natural, black or a custom match)
- Fill type and percentage, if any
- Melt flow, if you know it
- Quantity for this order and what you use in a year
- Ship-to ZIP or postal code
A second quote on your grade? Lot size, freight and timing move the price you pay. See how resin is priced.