Resin on allocation or force majeure: what to do

A checklist for the first 48 hours and the options that keep your line running.

The short answer

Find out exactly which grades are affected and how long your inventory lasts, then line up a second source for the same polymer before considering a different material. Same-polymer equivalents qualify fastest. Tell your customer early if an approved part might change.

An allocation letter or a force majeure notice usually arrives with little warning. The first few days decide whether it becomes a short squeeze or a line-down problem. This page is a practical checklist for buyers and plant managers.

Allocation and force majeure, in plain terms

Allocation means the producer limits each customer to a share of their recent purchases because demand is higher than supply. Force majeure means the producer is declaring that an event outside its control, such as a plant outage, a feedstock shortage or a hurricane, prevents it from meeting commitments for now. Both usually come with a restart estimate that can move.

What to do in the first 48 hours

  1. Confirm what is affected. Which grades, which plants, what allocation percentage and the expected duration. Ask in writing.
  2. Count your cover. Weeks of inventory on hand and on order, for each affected grade, against your production plan.
  3. Rank your parts. Decide which parts and customers get the resin first if you cannot cover everything.
  4. Call a second source now. Ask for the same polymer from another producer or from existing distributor inventory, and request data sheets and COAs to compare.
  5. Check your approvals. Look at drawings and specs for approved alternates, and tell your customer early if a material change might be needed.
  6. Stretch supply. Reduce scrap and use regrind within your spec limits while replacement resin is arranged.

Your options, fastest first

OptionSpeedWatch for
Same grade from distributor or secondary stockFastestUsually priced higher; check lot dates and storage
Equivalent grade from another producerFast to moderateNeeds a data sheet comparison and a trial run, plus customer approval where the part requires it
Imported equivalentModerateLonger transit; check duties, paperwork and lot consistency, and run a trial before production
Alternate materialSlowestFull requalification and customer approval are usually needed
Stretch what you haveImmediateCut scrap, use regrind within your spec limits and prioritize your most critical parts

How to avoid the next one

  • Qualify a second source for every critical grade before you need it. See why you need a second supplier.
  • Write approved alternates into your specs so a switch does not start a new approval from scratch.
  • Hold extra safety stock on the grades that tighten most often, such as PA66 and some polycarbonate and specialty grades.
  • Watch for early signs: lead times stretching, price increases and producer notices often come before allocation. The monthly resin market note tracks them by resin family.

How we help

Send the grade that is on allocation and your monthly usage. A polymer chemist will look for the same polymer from another source or existing inventory, and suggest an alternate for you to qualify if needed, with a supplier COA on every prime lot. We have access to 100+ partner warehouse locations and ship across the U.S. and Canada, from one gaylord to a railcar. We aim to quote within one to three business days. Our backup source program keeps an alternate on file for you to qualify and reprices it on request, so the next allocation is easier.

Common questions

What does resin allocation mean?

The producer limits how much each customer can buy, usually as a percentage of what you bought over a recent period. It is used when demand exceeds what a plant can supply, often after an outage.

What does a force majeure declaration mean for my supply?

The producer is saying an event outside its control, such as a plant outage, a feedstock problem or a hurricane, stops it from meeting its supply commitments for now. What it means for your contract depends on the contract terms, so check with your purchasing or legal team. We are not lawyers.

How long does allocation usually last?

It varies with the cause, from a few weeks for a short plant outage to several months for a major disruption. Producers usually update customers as they restart.

Can a distributor still get resin when a producer is on allocation?

Often, at least partly. Distributors may hold inventory bought before the allocation, and they can offer the same polymer from other producers or import sources. Expect to compare grades and data sheets rather than get the identical part number.

How do I avoid getting caught by allocation again?

Keep a qualified second source on file for critical grades, list approved alternates on your drawings or specs, and hold a little more safety stock on the grades that tighten most often.

Grade on allocation? Send the grade and the volume you need, and we will quote it where we can source it, or a matched alternative. Get a quote →

Related pages (6)
Text usRequest a Quote